11/06/2026
Ever stopped to look at the welds?
Flick through for a closer look at how an Extreme comes together. Design, cutting, fabrication, paint, upholstery and final fit-out are all handled by one in-house crew in New Zealand - with a shelf full of Hutchwilco Boat Show trophies to show for it. Rails and fittings are welded straight to the alloy, not bolted on.
We've put more Extreme Boats on the water than any other dealer in the country - workmanship like this is a big part of why.
Enquire: https://bit.ly/4sFSSth | Call: 0440 130 048