05/06/2026
The week that was @ Dubsmith Garage π€
β64 11 Window - engine tinware put through the Blasting cabinet and prepped for colour works. Loaded into the booth today, epoxy coated, basecoat and clearcoat laid down and looking a treat. A little twist of standard black with a green pearl in the basecoat to complement the exterior green colour and also the engine bay colour. Reassemble next week to have looking a treat.
β66 11 Window - wheels and tyres sorted and looking a treat. Gearbox reassembled after painting, bolted in place, CV shafts and joints assembled and bolted in and looking at treat. Engine Bay assembly coming along nicely. Engine just about ready to bolt in place likely next week and get this fired up and brought to life.
β63 11 Window - metalworks undecided finalising the rack and pinion kit install. Trial fitment always necessary when fitting in amongst aftermarket repair panels. Cab floor needing some attention to relocate the steering column hole as it did not lineup with the kit underneath. Engine tinware put through the blast cabinet and prepped through the week for colour works. Epoxy coated, basecoat colour and clear laid down and looking a real damn treat now almost completely assembled.
β74 Baywindow - final pieces of the puzzle being attended to. Some final road testing next week before heading back north to its home. Door window rubbers and scrapers going in on both doors.
β75 Baywindow - mechanical works just about wrapped up and out doing some road. Shakedown works to fine tune the engine and some suspension settings.
β56 Oval Beetle - re-valance metalworks in full swing. New metal mostly complete and welded off with the rear valance needing some fine-tuning to have spotless then ready to weld off and smooth out all the welds completely. Lower B pillar inside the cab at the base of the cab door pillars being repaired to have structurally sound metal again ready for new heater tubes to go in likely starting next week.