06/24/2026
🔥This 25ft DownEaster was quiet the project
🔥Very Heavily Oxidized needed 2 stages of sanding🔥
🔥Followed by a Heavy Cut Compound to remove the Oxidization🔥
🔥Medium Cut Compound needed to blend the swirl marks and holograms left from the Heavy Cut Compound 🔥
🔥Finally added a coat of Polymer Sealant to lock in all the goodness🔥
🔥Soft deck flooring removed and adhesive removed from the deck🔥
🔥All Vinyls, Rubber, and Plastics on the interior protected with Bling Sauce Conditioning Sauce 🔥