11/06/2026
Marks Studio 2 update, lots done this week , rotten section of step cut out and replaced, inner sill prepped and acid treated, new outer sill prepped, inner sill and in side the new sill zinc coated and welding surfaces weld through primed. Sill fitted and welds dressed . Rotten section of flitch panel cut out , new section made up and welded in , same with the shock mount , a panel lip removed and lip acid treated along with the scuttle closure . Sill and inner wing spot primed to stop flash rust .
Garage is now shut untill Tuesday as we are away for a long weekend.