10/27/2026
Last week update.
Tuesday- we got the box from the big box store and got the seals changed on the 3rd member and axles. Then we got the transmission up in place, only loosly installed the bolts, filled with alittle bit of fluid, installed the torque converter and then hooked evweything up.
Friday- we got the rest of the stuff we needed for the motor. After we tried to install a fitting on the water neck housing we realized it wouldn't work, so we need to order more parts, lol
Today- was a very good and busy day.
1. We got the 3rd member up and in place, now just waiting for the RTV to dry up and then we can torque it all up. Installed the drive shaft.
2. We installed the back intake fittings installed, we filled the eng with oil, primed the eng, installed the distributor. Then we took the end off the stand and installed the flywheel. Only thing left is to install it and thats what we did.
3. Hooked up the torque converter and torque down the transmission mount.
4. We prefit the exhaust and marked where the new O2 sensors will go, made sure we had room and then got the exhaust ready for the new bungs to be welded on
So all 3 major parts are now back in the racecar. We have a ton of little things to hook up, but today was huge!
Stay tuned for what we get done tomorrow.
Thanks for the support