Another great local project - earlier this spring we were asked to improve access to a recently acquired island property. Current infrastructure was in poor condition & as an avid boating family the new owners prioritized float size, durability and longevity
We constructed a pair of 16x24s in the New Rd shop with extra height and bracing, all CCA framing and topped off with WearDeck composite decking. Lots of large commercial cleats & solar lighting completed the project.
We drilled & pinned them back to the ledge and tensioned the system to 15,000lbs of granite offshore anchors for a safe and secure system that maintains perfect alignment during any tide stage
Next up will be addressing the old steel pier, but for this season it’s a safe & usable system