10/24/2026
I hit a milestone in the avionics upgrade project yesterday. Firewall forward is complete. Front Baggage compartment floor is installed. All tests good.
Everything aft of the passenger area is done. Autopilot servos installed, wired and tested. All new sensors are installed.
95% of the instrument panel wiring harness is complete, and all the switches are installed. The cowling and wheel pants are repainted and waiting to be installed.
The final push is installing the panel and connecting the harnesses, then Jeff can program the system and we should be back in the air before spring.
This short video is of the front compartment, an area that has been a ragged hole with dangling wires for the last two months.