20/10/2026
Building the Cape 26 fleet ⛵
• Hull 01 is out enjoying sublime sailing conditions on Lake Garda.
• Hull 02 is being finished off at the factory - primer is on and being sanded back ahead of the top coat. Guess the colour 👇
• Hull 03 is in the moulds, joined and about to receive internal structure before being released.
• Hull 04 is in for bulkhead prep.
One Design. Zero Compromise. Cape 26 Class Official